Send four things and we can quote immediately: grade, volume in cubic metres, pour date and site address. If you do not know the volume, send the element dimensions and we will work it out for you.

ContactNavi Mumbai
Hours
6 AM – 11 PM, all days
Office
4, Vikrant Sadan, Dattaram Khamkar Road, Gas Company Chinchpokali, Parel
City
Navi Mumbai 410218
GSTIN
27XXXXXXXXXXXZX
Payment
100% advance

Order to pour

How a booking actually runs

Six steps, in this order, every time. Nothing here is a surprise on the day of the pour.

  1. Tell us grade, volume and pour date

    Give us the grade from your structural drawing, the volume in cubic metres, the pour date and the site address. If you do not know the volume, send the element dimensions and we will work it out.

  2. We confirm slot, rate and placement method

    You get a written quote showing basic rate, pumping charge, any part-load charge and GST, plus a confirmed despatch slot and the plant we will supply from.

  3. Pay 100 percent in advance

    Payment is credited before the first mixer leaves the plant. NEFT, RTGS, IMPS and UPI. GST invoice raised against despatch.

  4. Batching and despatch

    The mix is batched by weight against your grade specification. Each mixer leaves with a batch report and a delivery challan showing time of batching.

  5. Delivery, placement and cube casting

    Mixers arrive in sequence to keep the pour continuous. Cubes are cast on site at IS 456 sampling frequency in your engineer's presence.

  6. Test reports at 7 and 28 days

    Compressive strength results are issued on letterhead. If a result falls short we investigate it with you rather than around you.

Weigh batching plant: cement silos, aggregate bins, mixing unit
150 mm
150 mm cube specimen, broken at 7 and 28 days
100%Advance

Payment terms

Payment is credited in full before the mixer leaves the plant. NEFT, RTGS, IMPS and UPI accepted. A GST invoice is raised against every despatch and input credit is available to registered buyers.

We do not run credit accounts and we do not chase retention. That is a deliberate choice: it is why our rate holds where it does and why your slot never gets given away to a customer with a better payment history.