Metal Ministry Inc +91 98921 71042

Mumbai · MMR · India

Concrete that arrives while it is still concrete

Ready mix concrete batched to IS 456 and on your slab before it loses slump. M7.5 to M60, weigh-batched to IS 456, delivered across Mumbai, Thane and Navi Mumbai inside the working life of the mix. Free 7 and 28 day cube reports on every project.

Rate snapshotMumbai
M20 / cum
Rs. 4,750
M25 / cum
Rs. 5,100
M30 / cum
Rs. 5,550
M40 / cum
Rs. 6,450
Mixer capacity
6 cum
Working life
90 – 120 min
Cube reports
Free
Payment
100% advance
GST
18% extra

The constraint

You have ninety minutes. Everything else is detail.

Ready mix concrete begins hydrating the moment water meets cement. From that point you have roughly 90 to 120 minutes of usable working life, extended by retarder but never indefinitely. Miss the window and the options are all bad: place stiff concrete badly, add water and lose the strength you paid for, or send the load back.

So the useful question when you are buying concrete is not who is cheapest per cubic metre. It is which plant is close enough, and whether they will sequence the mixers to match your placement rate. We publish our plant locations and honest travel times on every page of this site for exactly that reason. Where a site sits outside our window, we say so and point you elsewhere.

Working life: 90 to 120 minutes from batching

Rate card

Ready mix concrete price list

Indicative Mumbai suburban rates per cubic metre, ex-GST. Every grade below is a design mix batched by weight, with a printed batch report travelling with the load.

Grade, specification and indicative rate per cubic metre for Mumbai. Ex-GST. 20 mm nominal aggregate unless stated.
GradeMPaClass Slump mmAgg mmCement kg/cum Max w/cExposureTypical use Rate / cum
M7.57.5Ordinary50-75202000.62MildLevelling course, mass fill, solingRs. 3,950
M1010Ordinary50-75202200.60MildPCC bedding, blinding, kerb backingRs. 4,150
M1515Ordinary75-100202400.58MildFlooring base, compound flooring, plinth fillRs. 4,450
M2020Standard100-125203000.55ModerateResidential slabs, columns and footings in low-rise workRs. 4,750
M2525Standard100-150203200.50ModerateRCC slabs, beams, columns and rafts in mid-rise workRs. 5,100
M3030Standard120-160203400.45SevereHigh-rise slabs, water tanks, basementsRs. 5,550
M3535Standard120-160203600.45SeverePost-tensioned slabs, piles, shear wallsRs. 5,950
M4040High140-180203800.40Very severeColumns of tall buildings, bridge decks, marine workRs. 6,450
M4545High150-180204000.40Very severeHeavy industrial floors, transfer girdersRs. 7,000
M5050High150-200204200.38ExtremeTower columns, marine piles, precastRs. 7,600
M5555High160-20012.5-204400.36ExtremeSelf-compacting pours, congested reinforcementRs. 8,300
M6060High160-22012.54600.34ExtremeUltra high-rise columns, special structuresRs. 9,100

Add 18 percent GST. Rates assume a full 6 cum load, chute discharge and standard plant hours. Cement content and water-cement ratio follow the durability limits in IS 456 Table 5 for the exposure class shown.

Full rate card and additional charges

Where it goes

What ready mix concrete is used for in Mumbai

Grade selection is a durability decision as much as a strength decision. Pick from the element you are casting and the environment it will sit in, not from the cheapest number on the rate card.

M25 - M35

Slabs and floor plates

Suspended floor slabs, podium decks and terrace slabs. Slump is set at 120 to 150 mm for pumped placement, and continuity of supply matters more than any other factor, because a cold joint in the middle of a slab is a permanent defect.

M30 - M60

Columns and shear walls

Vertical members carry the highest stresses in a tall building and are poured into tight, congested formwork. Higher slump with smaller aggregate improves flow around dense reinforcement without segregation.

M25 - M40

Foundations, rafts and pile caps

Large monolithic pours where heat of hydration must be controlled. Blended cements reduce peak temperature, and mixer cycling is planned so the previous layer has not set before the next arrives.

M30 - M45

Piling

Tremie-placed concrete requires high cohesion and high slump with no segregation. A pile pour must not be interrupted, so mixers are staged before starting rather than despatched as the pour proceeds.

M30 - M35

Basements and retaining walls

Water-retaining and earth-retaining elements are governed by permeability, not strength. A low water-cement ratio with an integral waterproofing admixture is what actually keeps a basement dry.

M30 - M45

Industrial and warehouse floors

Large-area floors with flatness tolerances and abrasion resistance requirements. Steel or polypropylene fibre dosing controls shrinkage cracking across the wide unjointed bays modern warehouses demand.

M30 - M40

Roads, pavements and hardstanding

Pavement quality concrete designed for flexural strength rather than compressive strength alone. Placement rate and finishing discipline determine ride quality more than the mix design does.

M30 - M35

Water tanks and STP structures

Liquid-retaining structures under IS 3370, where crack width control governs the design. That means low water-cement ratio, disciplined curing and a mix that will not shrink away from the reinforcement.

M7.5 - M15

PCC, levelling and blinding

Non-structural layers under footings, floors and pavements. Cheap, fast and unglamorous, but a poor blinding layer will misalign every bar laid on top of it.

M40 - M60

Precast and prestressed elements

Factory or yard casting where early strength governs the demoulding cycle. Consistency between batches matters more than any single batch result.

Order to pour

How a booking actually runs

Six steps, in this order, every time. Nothing here is a surprise on the day of the pour.

  1. Tell us grade, volume and pour date

    Give us the grade from your structural drawing, the volume in cubic metres, the pour date and the site address. If you do not know the volume, send the element dimensions and we will work it out.

  2. We confirm slot, rate and placement method

    You get a written quote showing basic rate, pumping charge, any part-load charge and GST, plus a confirmed despatch slot and the plant we will supply from.

  3. Pay 100 percent in advance

    Payment is credited before the first mixer leaves the plant. NEFT, RTGS, IMPS and UPI. GST invoice raised against despatch.

  4. Batching and despatch

    The mix is batched by weight against your grade specification. Each mixer leaves with a batch report and a delivery challan showing time of batching.

  5. Delivery, placement and cube casting

    Mixers arrive in sequence to keep the pour continuous. Cubes are cast on site at IS 456 sampling frequency in your engineer's presence.

  6. Test reports at 7 and 28 days

    Compressive strength results are issued on letterhead. If a result falls short we investigate it with you rather than around you.

Weigh batching plant: cement silos, aggregate bins, mixing unit
150 mm
150 mm cube specimen, broken at 7 and 28 days
100%Advance

Payment terms

Payment is credited in full before the mixer leaves the plant. NEFT, RTGS, IMPS and UPI accepted. A GST invoice is raised against every despatch and input credit is available to registered buyers.

We do not run credit accounts and we do not chase retention. That is a deliberate choice: it is why our rate holds where it does and why your slot never gets given away to a customer with a better payment history.

GSTIN 27XXXXXXXXXXXZX · Ready mix concrete, HSN 3824 50 10, GST 18 percent.

Coverage

Where we supply

Deepest in Mumbai and the MMR, where we run our own plants and fleet. Elsewhere in India we supply through vetted partner plants under our specification and testing regime.

Mumbai

Mumbai Metropolitan Region

Other cities

States

Questions

Ready mix concrete in Mumbai: common questions

How quickly can you deliver ready mix concrete in Mumbai?

Our nearest batching plant to Mumbai is at Sewri, with a typical loaded travel time of about 30 minutes. For sites inside our core service radius we despatch within 60 minutes of a confirmed order, subject to slot availability. Book the previous evening for a morning slab pour and mixers will be at your gate at the agreed time.

What is the minimum quantity I can order in Mumbai?

A transit mixer carries 6 cubic metres. We do supply less, but a part load below 6 cum attracts a flat charge because the drum and the trip are committed either way. Below about 3 cum, site-mixed concrete is usually more economical and we will tell you so.

What are your payment terms?

100 percent advance. Payment must be credited before the mixer leaves the plant. We accept NEFT, RTGS, IMPS and UPI. A GST invoice is raised against every despatch and input credit is available to registered buyers. We do not operate credit accounts, which is exactly why our rates stay where they are.

Which concrete grade should I use for a residential slab in Mumbai?

M25 is the practical default for residential slabs, beams and columns. M20 is the absolute minimum permitted by IS 456 for reinforced concrete. If the element touches soil or water, or the site is near the coast, step up to M30 with a blended cement regardless of what the strength calculation alone suggests.

Do you provide a concrete pump in Mumbai?

Yes. Line pumps and boom placers are arranged as a separately charged service. Line pumping carries a 15 cum minimum, boom placers a 30 cum minimum. Confirm placement equipment when you book, because equipment availability is more often the scheduling constraint than concrete availability.

How long does ready mix concrete stay workable?

Design working life is 90 to 120 minutes from batching, controlled by retarder dosage set against haul distance and ambient temperature. Beyond that window slump loss becomes irreversible, and adding water on site destroys the strength you have paid for. Never allow water to be added to the drum at site.

Do you provide cube test reports?

Yes, at no charge. Cubes are cast at the sampling frequency in IS 456 Clause 15, and we issue 7 day and 28 day compressive strength reports on letterhead. Every load also carries a batch report showing the actual weighed quantity of each ingredient.

Is GST included in the quoted rate for Mumbai?

No. All rates shown are ex-GST per cubic metre. Ready mix concrete attracts 18 percent GST under HSN 3824 50 10. The final invoice shows the basic rate, any pumping or part-load charges, and GST separately.

Can you deliver at night or on a Sunday in Mumbai?

Yes. Night and holiday pours are common where daytime traffic restrictions apply, and large rafts are often deliberately scheduled overnight for continuity. A night surcharge applies between 10 PM and 6 AM. Book at least 24 hours ahead for night slots.

What happens if it rains during the pour?

Light rain during placement is manageable with covering and care. Sustained rain compromises the surface and the water-cement ratio, and the correct decision is to stop. If we have already despatched and you postpone at short notice, loads on the road are chargeable, so watch the forecast before confirming a slab pour.

What is the full form of RMC?

RMC stands for ready mix concrete: concrete batched to a designed proportion at a central plant and delivered to site in a transit mixer, ready to place. It is the opposite of site mixed concrete, where cement, sand, aggregate and water are proportioned by hand in a mixer at the site itself.

Is ready mix concrete better than site mixed concrete?

For anything structural, yes, and the reason is consistency rather than strength on paper. RMC is batched by weight under computer control, so every cubic metre is the same. Site mixing proportions by volume using head pans or a farma, which drifts through the day with labour, moisture in the sand and how full the pan happens to be. RMC also eliminates material storage, theft and wastage on congested plots. For small pours under about 3 cubic metres, site mixing is usually still cheaper and we will say so.

How many bags of cement are there in 1 cubic metre of M25 concrete?

Roughly 6.4 bags. M25 needs a minimum of 320 kg of cement per cubic metre and a bag holds 50 kg, which gives 6.4 bags. M20 works out to about 6 bags at 300 kg, and M30 to about 6.8 bags at 340 kg. These are minimum durability figures from IS 456; the actual design mix may carry more cement depending on aggregate grading and the admixture used.

How much concrete do I need for a 1000 square foot slab in Mumbai?

For a 125 mm thick slab, 1000 square feet works out to about 11.6 cubic metres, so two transit mixers. At 150 mm thickness it is roughly 14 cubic metres. Add about 3 to 5 percent for wastage, formwork deflection and any level correction. Send us the slab dimensions and thickness and we will calculate it properly, including the beams, which people usually forget to include.

What is the GST rate on ready mix concrete?

18 percent. Ready mix concrete is classified under HSN 3824 50 10. If you are GST registered, the input credit is available to you, so the effective cost is the basic rate. Every despatch is invoiced with the basic rate, additional charges and GST shown as separate lines.

Which grade of concrete is used for a house slab?

M25 for most residential slabs, beams and columns. M20 is the minimum that IS 456 permits for reinforced concrete, and it is adequate for small G+1 or G+2 structures in mild exposure. Step up to M30 if the slab is a terrace exposed to weather, if the structure is near the coast, or if any element will sit in contact with soil or water.

What is the difference between M20 and M25 concrete?

The number is the characteristic compressive strength in megapascals at 28 days, so M25 is 25 percent stronger than M20 on paper. The more important difference is durability: M20 permits a water-cement ratio up to 0.55 with 300 kg of cement, while M25 tightens that to 0.50 with 320 kg. The lower water-cement ratio is what keeps water and chlorides out of the concrete and stops the reinforcement corroding, which is what actually determines how long the structure lasts.

How do I calculate the concrete quantity for my pour?

Multiply length by width by thickness in metres to get cubic metres, then add the beam volumes separately. A 10 m by 10 m slab at 0.125 m thick is 12.5 cubic metres. Order in whole mixer loads of 6 cubic metres where you can, because part loads carry a flat charge. Send us your dimensions and we will do the calculation and tell you honestly if you are better off with one mixer than two.

Do you supply ready mix concrete for small house construction in Mumbai?

Yes. Individual house builders are a large part of what we do in Mumbai. The practical floor is about 3 cubic metres, below which site mixing usually costs less. Between 3 and 6 cubic metres you pay a part-load charge but still get weigh-batched concrete and a cube report, which most self-builders find worth it for a slab they will live under.

Book a pour

Get a rate in Mumbai in one call

Tell us the grade, the volume in cubic metres and the pour date. You get a written quote with the basic rate, pumping charge and GST shown separately. Payment is 100 percent advance and the slot is yours.

div class="callbar"> Call now WhatsApp