Metal Ministry Inc +91 98921 71042

Maharashtra · Seismic Zone III

Fe 500 CRS TMT Steel Bar Suppliers in Ambad MIDC

Metal Ministry Inc has been trading structural steel since 2009. For Ambad MIDC, Nashik, that means Fe 500 CRS TMT steel bars available in bulk, from primary mills, with the paperwork a project auditor will accept without a second look.

24 To 36 HoursDelivery to Ambad MIDC 5 MTMinimum order 1%Discount on advance 20 yrsStockholding since 2005
Mill test certificate Fe 500 CRS
Standard
IS 1786:2008 with CRS chemistry
Yield stress
500 N/mm² min
UTS
545 N/mm² min
Elongation
12.0% min
Carbon max
0.30%
S + P max
0.175%
Bend / re-bend
4d / 5d
Sizes held
8, 10, 12, 16, 20, 25, 32 mm
Despatch to Ambad MIDC, NashikHeat no. on every tag

Specification

Fe 500 CRS to IS 1786:2008 with CRS chemistry

Copper and chromium alloying slows chloride attack — the standard specification within a few kilometres of the sea. Corrosion resistant steel with controlled copper, chromium and phosphorus.

Yield strength
500 MPa min
Tensile strength
545 MPa min
Elongation
12.0% min
TS / YS ratio
1.08 min

Metal Ministry Inc has been trading structural steel since 2009. For Ambad MIDC, Nashik, that means Fe 500 CRS TMT steel bars available in bulk, from primary mills, with the paperwork a project auditor will accept without a second look.

Mechanical and chemical requirements for Fe 500 CRS under IS 1786:2008 with CRS chemistry. These are the minimums we test against before a load is released.
PropertyRequirementWhy it matters on site
0.2% proof / yield stress500 N/mm² minSets how much load each bar carries, so it drives the steel quantity in your design
Ultimate tensile strength545 N/mm² minThe reserve above yield before the bar actually breaks
TS / YS ratio1.08 minA higher ratio means the structure warns you before it fails
Elongation on gauge length12.0% minHow far the bar stretches before fracture — this is what lets you bend it on site
Bend test4d / 5dNo cracking on the outside of the bend at the specified mandrel
Re-bend test5d / 7dCatches embrittlement after ageing, which is where cheap bar fails
Carbon0.30% maxLower carbon means better weldability and less brittleness
Sulphur0.055% maxExcess sulphur causes hot shortness and cracking
Phosphorus0.120% maxExcess phosphorus makes the bar brittle in cold weather
Sulphur + phosphorus0.175% maxThe combined limit is the single best indicator of primary versus secondary steel

Sizes and weight chart

Every load is weighed before it leaves. If the actual weight per metre drifts more than 2% below the nominal figure below, the bundle does not go on the trailer.

Sizes of Fe 500 CRS we hold, with nominal sectional area and unit weight. Actual weight is checked on our weighbridge and held inside ±2% of these figures.
DiameterArea (mm²)Weight (kg/m)Per 12 m bar (kg)Bars per tonne
8 mm50.30.3954.74211
10 mm78.50.6177.40135
12 mm113.10.88810.6694
16 mm201.11.58018.9653
20 mm314.22.47029.6434
25 mm490.93.85046.2022
32 mm804.26.31075.7213

Supplying Ambad MIDC, Nashik

Most of the demand here is industrial: pre-engineered building foundations, plant civil work, machine bases and warehouse floors. That means heavy diameters, tight delivery windows and clients who read the mill test certificate line by line.

Direct trailer movement via NH-160 from Bhiwandi, with part loads consolidated twice a week for smaller sites. Work currently running in and around Nashik includes Samruddhi Mahamarg interchanges, Sinnar and Satpur MIDC expansion, Nashik smart city works, which is where most of our tonnage in this belt goes.

Where CRS actually pays for itself

Coastal and marine construction, sewage and effluent works, chemical plants, high-humidity and high-chloride sites. Inland and in dry conditions, ordinary Fe 500D does the same job for less money — we will tell you so rather than sell you the upgrade.

What Fe 500 CRS is right for

Best used for: Coastal and marine construction, sewage and effluent works, chemical plants, high-humidity and high-chloride sites.

Think twice about: Dry inland sites, where the corrosion premium buys nothing.

Applications

Where Fe 500 CRS goes on site in Ambad MIDC

Industrial floors and warehouse sheds

Mesh and 8 mm to 12 mm bar for slabs on grade, plus foundation steel for pre-engineered buildings.

Bridges, flyovers and metro viaducts

Fe 550D and Fe 500S to IS 13920 detailing, with third-party test reports usually mandated by the client.

Water tanks, STPs and effluent works

Extra-ductile D grades with tight crack-width control, because these structures are designed to not leak.

Slabs, beams and staircases

8 mm to 16 mm distribution and main steel. The grade you can bend on site without cracking is the grade that gets used.

Fe 500 CRS TMT bars bundled and tagged for despatch to Ambad MIDC, Nashik
Bundle tag carries the heat number — Fe 500 CRS
TMT bar stock held for Nashik deliveries
Ready stock, Satpur stock point
Trailer loaded with mixed diameter TMT bars for Ambad MIDC, Nashik
Mixed diameter loads, no penalty
Why buy here

How we sell steel in Nashik

No mystery pricing, no quiet weight games. Four things we hold to on every order.

Barter accepted from developers

Fifty per cent in cash, fifty per cent in ready units with occupancy certificate. Steel moves, your unsold inventory moves, both books get cleaner.

Rejected material is replaced, not argued about

If your consultant rejects a consignment on test results, we lift it and replace it with fresh material. No debate, no restocking charge.

25 years in the same trade

Working in structural steel since 2000, through three cycles of the market. The people who take your call have been doing this for decades, not months.

We are stockholders, not brokers

Material sits in our own stockyards under our own name. When you release a purchase order you are buying steel that already exists, not steel we still have to source.

Price

What decides your landed price in Ambad MIDC

Contractors searching for the best price TMT supplier in bulk usually compare the wrong number. The basic rate per tonne is only one of five things that decide what the steel actually costs you by the time it is standing on site.

  • Basic rate per tonne — moves daily with mill and billet prices.
  • Rolling margin — a supplier working at the loose end of the IS 1786 tolerance delivers less steel for the same money. This is the hidden cost most people miss.
  • Freight to Ambad MIDC — 24 to 36 hours from Satpur stock point, quoted separately so you can compare it.
  • Diameter mix — small diameters cost more per tonne than 20 mm and above. A load that is mostly 8 mm will never match a load that is mostly 25 mm.
  • Payment terms — 100% advance earns a flat 1% cash discount on the basic value. On a 100 MT order that is real money, and it is the one line on this list you fully control.

Send your bar bending schedule and we will price all five lines against it. For bulk TMT sariya orders above 50 MT in Nashik we can usually hold the rate for the full despatch window rather than repricing each trailer.

Cross section of a Fe 500 CRS TMT bar showing the hard tempered martensite rim and ductile core
Why TMT works: hard rim, soft core
Payment

100% advance, and 1% comes off

Steel is a working-capital business. We would rather pass the funding cost back to you than build it into the rate.

100% advance against proforma invoice

Full invoice value paid before despatch earns a flat 1% cash discount on the basic value of the order.

The discount is on the invoice, not a promise

It is shown as a line on the tax invoice, so your accounts and your auditor both see it.

Rate locked for the despatch window

Once the advance is received the rate is held for the agreed schedule, whatever the mill does that week.

Part-despatch is fine

Pay for the full order, lift it in as many trailers as your slab cycle needs.

Credit policy

How credit works here, stated plainly

We do extend credit. We just do it after we know each other, and we say so upfront instead of promising terms we later withdraw.

ORDERS 1 TO 5

100% advance. Every order earns the 1% cash discount. This is where the working relationship gets built.

AFTER THE FIFTH CLEAN TRANSACTION

We sit down with your team, look at your project pipeline, GST returns and payment history, and agree a credit line.

CREDIT TERMS THEREAFTER

Typically 30 to 45 days against PDC or bank guarantee, sized to your monthly offtake and reviewed every quarter.

WHY IT WORKS THIS WAY

A supplier who hands credit to a first-time buyer prices that risk into everyone's rate. We would rather keep the rate honest and earn the credit decision.

Quality

Test it, and reject it if it fails in Ambad MIDC, Nashik

Every buyer has been burned by underweight bundles and secondary steel sold as primary. Here is what removes that risk from your side of the table.

Mill test certificate with every load

Heat number, chemistry and mechanical results, matched to the bundle tags on your delivery challan.

Third-party NABL testing on request

Samples drawn in the presence of your engineer and sent to an independent laboratory. You are welcome to nominate the lab.

Free replacement on rejection

If material fails your consultant's test, we lift it from site and replace it with fresh stock at our cost.

Primary mill material only

We do not sell secondary, re-rolled or unbranded bar as primary. The heat number on the tag is traceable to the mill.

Barter

TMT steel against ready flats: 50% cash, 50% units

For developers sitting on completed but unsold inventory, steel can be paid for partly in units instead of cash. It frees your project to keep moving without drawing down more debt.

50% in cash, 50% in units

Half the order value is settled in cash on the normal advance terms. The balance is settled against ready residential or commercial units.

Units bought at 25% to 30% below market

The unit value is fixed at a 25 to 30 per cent discount to the prevailing market rate for that project, agreed in writing before the first trailer moves.

Occupancy certificate is mandatory

Only completed units with OC received are considered. Under-construction inventory, unsold RERA stock without OC and disputed units are not taken.

Clean title, clean paperwork

Title search, encumbrance check and society or association clearance are completed before the barter agreement is signed.

Every barter proposal is assessed case by case on location, project stage, title and saleability. A discussion costs nothing and takes about a week to conclude. Read the full barter terms.

Questions

Fe 500 CRS in Ambad MIDC — the questions buyers actually ask

Do you deliver Fe 500 CRS TMT steel bars to Ambad MIDC, Nashik?
Yes. We despatch from our Satpur stock point and normal lead time to Ambad MIDC, Nashik is 24 to 36 hours once the purchase order and payment terms are confirmed. Direct trailer movement via NH-160 from Bhiwandi, with part loads consolidated twice a week for smaller sites.
What is the price of Fe 500 CRS TMT steel bar in Nashik today?
Reinforcement steel is priced daily against mill rates, so we do not publish a fixed figure. Send the diameters and tonnage and you will get the basic rate per tonne, GST at 18% and freight to Ambad MIDC, Nashik quoted as three separate lines, usually within the hour.
What is the minimum order for Ambad MIDC, Nashik?
5 MT for a delivered load. Smaller quantities can be lifted directly from the stockyard, and the mill test certificate is issued either way.
Which diameters of Fe 500 CRS do you stock?
8, 10, 12, 16, 20, 25, 32 mm, in 12 metre standard lengths. Cut and bent material to your bar bending schedule is available on request.
Is Fe 500 CRS the right grade for work in Nashik?
Nashik falls in Seismic Zone III. Coastal and marine construction, sewage and effluent works, chemical plants, high-humidity and high-chloride sites. Where it is not the right call — dry inland sites, where the corrosion premium buys nothing — we will say so and quote the grade that is.
Do you give a discount for advance payment?
Yes. Pay 100% of the invoice value before despatch and you get a flat 1% cash discount on the basic value, shown as a line on the tax invoice.
Do you supply TMT bars on credit?
The first five transactions run on 100% advance, each earning the 1% cash discount. After five clean transactions we review your offtake, GST returns and payment record and agree a credit line, typically 30 to 45 days against PDC or bank guarantee.
Do you supply mill test certificates?
Yes, with every despatch. The heat number on the certificate matches the tag on the bundle, so it survives an audit.
People also search for

Get a rate for your site

Send the diameters and tonnage. You get basic rate, GST and freight as three separate lines, usually within the hour.

Call now WhatsApp